Orbital designed a new stormwater collection system for a client. This project evaluated more than 250 acres of watershed. A total of 5 detention basins were designed along with 8,000 feet of storm sewer piping. Also included in this project were pavement design with trench drain layout. Orbital performed construction monitoring during installation.