Orbital provided preliminary engineering design for the upgrade of an Underground Gas Storage Facility. Working with the client, Orbital completed the design of this project through FEL-1 and FEL-2 stages, with option evaluation and preliminary engineering. The project involved replacement of the facilities existing compression equipment to increase availability and improve reliability. The study also involved an analysis of the remainder of the facility to determine what other systems and equipment at the site would also require replacement. Cost estimates, preliminary equipment layouts, P&IDs and preliminary Electrical design as completed, along with a design basis and a project execution plan.
UAV Inspection
Unmanned Aerial Vehicle (UAV) Inspections combined with Alignment Surveys of Crane Runways Orbital Technical Solutions (OTS) provided Asset Integrity Services with use of Unmanned Aerial Vehicles (UAVs) and survey equipment. The equipment was used to complete visual...